Get Flash Player Get Flash Player Get Flash Player Requirements

Annual Project Day

Full sized view

The Labor of Love annual project day is held one Saturday each Spring. Projects are divided into the following types:

Major Projects

Teams of 10 to 20 people working at one location on one large task, or multiple small tasks.

Examples: paint the outside of a home, siding installation, handicap ramp construction, major cleaning, kitchen remodel, bathroom project.

Minor Projects

A team of one to four people on one or two tasks at a location.

Examples include: replacing a door or window, heavy landscaping, install a railing, replace a sink, electrical repair, etc.

Safety Patrol

Mobile handyman service. Goes into homes and does a safety inspection to check for life and safety issues.

Examples of work includes installing smoke detectors, changing light bulbs, checking door locks and railings, moving heavy objects.

Rake and Run

Groups of 10 to 20 people caravan to sites and undertake spring yard clean ups. The large numbers make it easy to complete a house in 20 to 40 minutes.

Labor of Love

c/o Alpha Remodeling

6921 Jackson Road

Ann Arbor, MI 48103

(734) 769-1900

Fax: (734) 769-1028