The Labor of Love annual project day is held one Saturday each Spring. Projects are divided into the following types:
Teams of 10 to 20 people working at one location on one large task, or multiple small tasks.
Examples: paint the outside of a home, siding installation, handicap ramp construction, major cleaning, kitchen remodel, bathroom project.A team of one to four people on one or two tasks at a location.
Examples include: replacing a door or window, heavy landscaping, install a railing, replace a sink, electrical repair, etc.Mobile handyman service. Goes into homes and does a safety inspection to check for life and safety issues.
Examples of work includes installing smoke detectors, changing light bulbs, checking door locks and railings, moving heavy objects.Groups of 10 to 20 people caravan to sites and undertake spring yard clean ups. The large numbers make it easy to complete a house in 20 to 40 minutes.